Materialload Material quantity reference

Concrete calculator

Enter the pour area and thickness. The result comes back in cubic yards for a ready-mix order, plus bags if you are mixing by hand.

Concrete calculator live
ft
ft
in
%

Slabs are 4 in; footings and pads 8–12 in.

$
You need
— cu yd
—
Weight —
Bags —
Area —
Depth —
$
Material cost $—
Check concrete mix prices

Affiliate link. The price above is calculated from the unit price you entered — it is not a quote.

A 10 × 10 ft slab at 4 inches thick is 33 cubic feet of concrete — 37 cubic feet with a 10% waste allowance, or 1.36 cubic yards. That weighs about 2.75 tons, or takes 82 bags of 60 lb mix.

What the calculator assumes

  • Density 150 lb per cubic foot for cured concrete. That is the number that turns volume into tons, and it holds for normal-weight mixes; lightweight aggregate mixes are 15% lighter.
  • Bag yield of 0.45 cu ft, which is one 60 lb bag of standard mix. Switch the bag selector to 0.6 for 80 lb bags — the yardage does not change, only the bag count does.
  • Waste defaults to 10%. Concrete is the one material where running short is a disaster rather than an inconvenience: you cannot top up a half-set pour.
  • Thickness is the finished slab, so the subgrade must be excavated deeper by the thickness plus the base.

Yards, bags and weight

Thickness Per 100 sq ft 60 lb bags Weight
4 in 1.23 cu yd 74 2.5 tons
5 in 1.54 cu yd 93 3.1 tons
6 in 1.85 cu yd 111 3.7 tons
8 in 2.47 cu yd 148 5.0 tons

The bag column is the one that changes decisions. At 74 bags per 100 sq ft, hand-mixing a 300 sq ft patio means 222 bags — roughly 6 tons of material moved twice, once into the mixer and once into the forms.

Ready-mix or bags

Ready-mix wins above about 1 cubic yard. Most suppliers have a 1-yard minimum and charge a short-load fee below 3 yards, so check the fee before assuming delivery is cheaper.

Bags win when the pour is small, access is bad, or you need to work in stages. A 4 × 4 ft pad, a set of fence post footings, or a step repair is bag work.

Rented mixer splits the difference for 1–3 yards, if you have two people. One person mixing 60 bags is a full day and a bad one.

Where the number goes wrong

Thickness measured at the edge. Slabs are thicker in the middle when the subgrade is crowned. Check depth in the centre of the pour, not at the form.

Forgetting the base. Concrete needs 4 inches of compacted base under it on most soils. That is a second material and a second calculation.

Adding water on site. Extra water makes concrete easier to place and weaker. If the mix is stiff, ask for a plasticiser, not a hose — the strength loss is permanent.

FAQ

Concrete mix questions

How many 80 lb bags of concrete make a yard?

Forty-five. An 80 lb bag yields 0.6 cubic feet, and a cubic yard is 27 cubic feet. In 60 lb bags it takes 60. At 4–6 dollars a bag that is $270–400 a yard against $150–190 for ready-mix delivered.

How thick should a concrete slab be?

Four inches for foot traffic, patios and shed floors. Five inches where a vehicle parks, six inches for a driveway carrying a truck. Thickness is what carries load; the mix strength matters less than people assume.

How much does a yard of concrete weigh?

About 4,050 lb, or 2 tons, at 150 lb per cubic foot. That is why ready-mix trucks are weight-limited as well as volume-limited, and why a 10-yard load is close to 20 tons.

How much waste should I allow for concrete?

Five to ten percent. Concrete is unforgiving — you cannot add more once the truck leaves — so a 10% cushion on a small pour is cheap insurance. On a slab with formwork you trust, 5% is enough.