Dean Vasquez

Writes and maintains every calculator on this site, and checks the numbers before a page goes live.

I write the calculators and the material guides on Materialload. That means I decide what a page asks for, what it returns, which density it assumes, and what it tells you when the answer is going to be wrong.

The work starts at the source, not at the keyword. For each material I collect density and coverage figures from manufacturer data sheets and state DOT aggregate specifications, record the range rather than a single headline number, and then write the calculator so that the assumption is printed on the page instead of buried in code you cannot see.

The rest of the job is arithmetic that other calculator pages skip: applying the waste allowance before the bag count instead of after, keeping the cost estimate tied to the same unit the weight is shown in, and refusing to display a price I did not get from a supplier.

What I check before a page goes live

Every calculator page on this site passes the same review. These are the checks, written out so you can hold the next page to them:

  1. The density figure is matched against two independent sources, and the spread between them is shown on the page if it is wider than 10%.
  2. The formula printed on the page is the formula the JavaScript runs — read line by line, not assumed.
  3. Every worked example in the copy is re-entered in the calculator and has to reproduce the number quoted.
  4. The waste allowance is applied to the volume before the bag count, never after, so bag counts round up from the real requirement.
  5. A metric switch converts the numbers already entered rather than reinterpreting them, and the cost basis follows the ton definition in use.
  6. The cases where the answer is wrong are written into the page — not into a footnote, and not left out.

What I am not

The scope limits matter more than the qualifications, so here they are in plain terms:

  • I am not a licensed contractor, engineer or code official, and nothing here is structural, engineering or permit advice.
  • Retaining walls above about 4 ft, structural slabs, footings carrying a load, and anything on a slope need a stamped drawing from someone who has seen the site. The calculators will say so where it applies.
  • Prices are never quoted. The cost field multiplies a unit price you type in, because material pricing is local and changes weekly.
  • Compaction, moisture content and supplier grading all move the real tonnage. The calculators give a planning number and say so.

Corrections

If a figure on a page does not match what your supplier quoted, that is a bug and I want it. Send the page, the number you expected and where it came from — a delivery ticket or a supplier page is enough. Corrections are logged on the editorial policy page and the page's checked date moves forward.