Materialload Material quantity reference

Method

How we calculate

Every number on this site comes from one of three short chains — volume, area coverage, or piece count. This page shows all of them, states the constant used for each material, and lists the cases where the answer will be wrong.

The core chain

Volume first, then cubic yards, then weight. Cost is applied last, using a unit price you supply — we never invent a price and present it as a quote.

Formulas used by every calculator on this site
Step Formula Example
Volume area (ft²) × depth (ft) × (1 + waste) 200 × 0.25 × 1.10 = 55 ft³
Cubic yards cubic feet ÷ 27 55 ÷ 27 = 2.04 yd³
Weight cubic feet × density ÷ 2,000 55 × 100 ÷ 2,000 = 2.75 t
Cost quantity × unit price + delivery 2.75 × $48 = $132

Depth is entered in inches or centimetres and converted to feet before use. Area for a rectangle is length × width; for a circle it is πr². Metric input is converted to feet at the boundary so there is one calculation path, not two that can drift apart.

Materials sold by area use a second, shorter chain: area (ft²) × coats × (1 + waste) ÷ coverage per unit, rounded up. There is no density and no weight in it, which is why a paint or tile page never shows a tonnage. The coverage figure it divides by is published in the coverage table below.

Materials that are counted rather than measured — rebar, fence pickets — use a third chain: run length ÷ spacing + 1 pieces per run, then converted into stock lengths with a lap at every splice. The +1 is not decoration. A 24 ft run at 12 in on centre takes 25 bars, because there is one at each end as well as one in between. The constants are in the linear table.

Densities we use

Density is the only figure in the chain that is not arithmetic, and it is the one that carries real uncertainty. There is no single authority that publishes a canonical density for “gravel”, because the value depends on the source rock, the grading and the moisture content. Anything claiming four decimal places is overstating what is known.

We use mid-range values compiled from US aggregate supplier specification sheets and standard civil-engineering references, rounded to figures that reflect the real spread rather than a lab ideal.

Bulk density assumptions, US customary units
Material lb/ft³ lb/yd³ tons/yd³
Gravel 100 2,700 1.35
Crushed stone 100 2,700 1.35
Pea gravel 100 2,700 1.35
Sand 100 2,700 1.35
Landscape rock 100 2,700 1.35
Topsoil 81 2,187 1.09
Fill dirt 105 2,835 1.42
Mulch 30 810 0.41
Compost 37 999 0.50
Concrete mix 150 4,050 2.02

These are dry, loose values. Wet sand and saturated topsoil run 10–20% heavier. If your supplier sells by weight and the material has been rained on, the tonnage on the ticket will exceed what the volume suggests — that is water in the voids, not a calculation error.

Coverage rates we use

Anything sold by area — paint, tile, wallcovering, panels, block, sod — uses a second engine with no density in it at all. The arithmetic is simply area × coats ÷ coverage per unit, rounded up to whole units after a waste allowance. The only uncertain figure is the coverage rate, so that is the one printed below rather than buried in code.

Coverage figures come from product data sheets where a manufacturer publishes one, and from retail pack labelling where they do not. Where a range exists we take the realistic end, not the best case: primer at 300 sq ft per gallon rather than the 400 on the can, block at 0.888 sq ft per face rather than a nominal 1.

Coverage assumptions, US customary units
Material Sq ft per unit Default waste
Paint per gallon 350 8%
Deck stain per gallon 250 5%
Primer per gallon 300 8%
Tile per box 10 10%
Wallpaper per roll 56 15%
Drywall per sheet 32 10%
Plywood per sheet 32 8%
Subfloor panels per sheet 32 10%
Deck boards per board 3.67 10%
Sod per roll 10 5%
Concrete block per block 0.888 5%
Mortar per bag 31 5%

Waste is not a fudge factor and it is not uniform. Paint loses 8% to the roller and the cut-in line; tile loses 10% to edge cuts in a square room and 20% in a herringbone; wallpaper loses 15% to pattern matching before a single drop is hung. Every calculator defaults to the figure for its material and lets you change it.

Linear counts we use

Rebar and fence pickets are sold by the piece, so they need a count rather than a measurement. Both are length divided by spacing, plus one, then rounded up — and both come out higher than people expect.

Counted materials, US customary units
Material Count rule Stock Default waste
Rebar run ÷ spacing + 1, each direction 20 ft, 20 in lap 10%
Fence pickets run ÷ (picket + gap) 5.5 in, 1/8 in gap 5%

Stock length is the correction that surprises people. Rebar comes in 20 ft sticks and fence rails in 8 ft lengths, so a run longer than the stock needs a splice — and a splice costs length twice over, once for the lap itself and once because the second piece has to start where the first one ended. A 24 ft slab run therefore needs two sticks, which is why the rebar page shows 71 sticks where 50 bars would do the work.

Bar weight is nominal, taken from ASTM bar-size tables rather than weighed: 0.668 lb per foot for #4, 1.043 for #5. Grade changes the yield strength, not the weight, so a grade 40 and a grade 60 stick of the same size weigh exactly the same.

Where the answer will be wrong

A calculator that never admits its failure modes is not a reference, it is a sales tool. These are the four cases where our output is systematically off:

  • Compaction. Crushed stone and crusher run lose 10–20% of loose volume under a plate compactor. We do not model compaction — the waste field is for over-ordering, not for predicting finished depth.
  • Uneven subgrade. We assume a single depth across the whole area. A sloped or rutted site needs the deepest point measured, or the area split into strips.
  • Non-rectangular shapes. Only rectangles and circles are supported. An L-shaped bed has to be split into two rectangles and added.
  • Local pricing. The default unit prices are national mid-range figures. Bulk material is heavy and cheap, so freight dominates the price — a yard of gravel costs meaningfully more 60 miles from the nearest quarry.

Where the prices come from

Default unit prices are national mid-range figures for 2026, expressed per ton, per cubic yard and per bag. They exist to give the cost field a sensible starting point, not to be quoted back at a supplier.

The cost output multiplies your unit price by the calculated quantity and adds whatever delivery figure you enter. It never substitutes a price of its own. If the field says $48 and you typed $48, the total is arithmetic, not a market claim.

Corrections

If a figure here does not match what your supplier quoted, the supplier is almost certainly right and we want to know. Corrections are handled under the editorial policy: every page carries the date it was last checked, and a substantive correction moves that date.