Concrete slab calculator
A slab is three decisions — thickness, base and joints. Enter the dimensions and thickness and get yards, bags, weight and the joint layout.
Slabs are 4 in; footings and pads 8–12 in.
Affiliate link. The price above is calculated from the unit price you entered — it is not a quote.
A 12 × 12 ft slab at 4 inches thick needs 48 cubic feet of concrete — 53 cubic feet with a 10% allowance, or 1.96 cubic yards. That is about 4 tons, or 118 bags of 60 lb mix.
What the calculator assumes
- Thickness is measured after the base is compacted, not the depth of the hole. A 4 inch slab over 4 inches of stone is an 8 inch excavation.
- Density 150 lb per cubic foot, bag yield 0.45 cu ft (60 lb). Switch the bag selector to 0.6 for 80 lb bags.
- Waste defaults to 10% because a slab is a single continuous pour: a shortage at the far corner means a cold joint, not a second trip.
- No allowance for thickened edges. A slab with a turned-down edge is thicker than the field thickness, and that volume has to be added by hand.
Slab thickness and what it carries
| Thickness | Use | Base under it | Joint spacing |
|---|---|---|---|
| 4 in | Patio, shed floor, footpath | 4 in compacted stone | 8–10 ft |
| 5 in | Car parking, hot tub | 4 in stone | 10 ft |
| 6 in | Driveway, small truck | 6 in stone | 12 ft |
| 8 in | Heavy vehicle, equipment pad | 6 in stone | 12–16 ft |
The base column is not optional. A 4 inch slab over bare clay will crack within two winters no matter what mix you buy, and the failure is invisible until it happens.
Joints, mesh and the sequence
- Excavate to thickness plus base depth, and slope the subgrade away from the building at about 1 inch per 8 ft.
- Place and compact the stone in 4 inch lifts.
- Form the perimeter, check the diagonal measurements are equal, and stake every 4 ft.
- Set mesh on chairs so it sits mid-depth. Mesh on the ground does nothing.
- Pour, screed, float, then cut control joints within 6–12 hours while the concrete is still green.
- Cure under plastic for 7 days. Curing is where the strength actually comes from.
Skipping step 6 is the most common cause of a dusty, weak surface. Concrete does not dry to strength; it cures, and curing needs water retained.
Where the number goes wrong
Measuring the slab, not the excavation. Add the base depth to your digging, and add the form board thickness to your material if the slab is deep.
Ignoring the slope. A slab that drains needs a fall of 1–2%. That is negligible for volume but critical for the finished surface, and it is decided before the pour.
Ordering the exact yardage. Ready-mix comes in quarter-yard increments and the truck holds what it holds. Order 5% over, and have somewhere to dump the surplus that is not your neighbour’s driveway.
Concrete mix questions
How thick does a concrete slab need to be?
Four inches for foot traffic and garden furniture, five for a car, six for a driveway that takes a truck. Below four inches a slab cracks under its own curing stresses regardless of the mix.
How far apart should control joints be?
Roughly 2–3 times the slab thickness in feet, so 8–12 ft on a 4 inch slab, and the panel should be roughly square. Joints go in 1/4 of the depth — one inch on a 4 inch slab.
Do I need rebar or mesh in a slab?
Mesh or fibre for slabs on grade that see foot traffic; rebar for driveways, anything over 5 inches, or where the subgrade is uncertain. Steel does not stop cracking — it holds the pieces together when it happens.
How much gravel goes under a concrete slab?
Four inches of compacted crushed stone on most soils, six where drainage is poor. That is a separate material: 100 sq ft at 4 inches is 1.23 cubic yards of stone before you order any concrete.