Materialload Material quantity reference

Primer calculator

Primer covers less than paint, especially on new board. Enter the wall run and height to get gallons at a realistic coverage rate.

Primer calculator live
ft
ft
%
sq ft

Bare drywall and patched walls drink primer — expect 250–300 sq ft per gallon, not the 400 on the can.

sq ft
$
You need
— gallons
—
Area —
With waste —
Waste —
Per gallon —
Material cost $—
Check primer prices

Affiliate link. The cost above is units × the price you entered — it is not a quote.

282 sq ft of wall takes 0.94 gallons of primer at 300 sq ft per gallon. With the 8% allowance the calculator returns 2 gallons — primer is sold by the gallon, so rounding up is the practical answer.

What the calculator assumes

  • 300 sq ft per gallon, the realistic rate on new or patched drywall. Use 350 for a sealed, previously painted wall and 250 for heavy patching.
  • One coat. Unlike paint, the coats field is preset to 1 because a second coat of primer is a specific decision, not a default. Change it if you are blocking a stain.
  • Openings deducted before the allowance, so a door and two windows come off the wall run first.
  • Waste defaults to 8%, which covers roller loss and the fact that you cannot buy a fraction of a gallon.

Coverage by surface

Surface Coverage Why it differs
Bare drywall 250–300 sq ft/gal Paper and joint compound absorb
Patched / skimmed wall 250 sq ft/gal Patch compound is the thirstiest surface
Previously painted, sound 350 sq ft/gal Already sealed
Bare wood 300–350 sq ft/gal End grain drinks it
Sealing a water stain 200 sq ft/gal Needs a shellac or oil stain blocker
Over glossy paint 300 sq ft/gal Needs sanding first or it will not key

The patched-wall row is the one that catches people: a room where you have filled forty screw holes and two seams will take noticeably more primer than the same size room that was not touched.

Where primer actually earns its money

  • New drywall. Bare paper and joint compound have wildly different absorption. Primer evens them out so the topcoat does not flash.
  • Colour change. Dark to light without primer means three or four topcoats instead of two.
  • Stain blocking. Water stains, marker, knots in pine and smoke residue bleed through paint forever without a shellac-based blocker.
  • Bare wood and trim. Primer is what the topcoat grips; paint on bare wood fails at the edges first.

Where the number goes wrong

Buying primer by the paint figure. Using 350 sq ft per gallon on bare drywall means you run out 20% short, which is exactly the stage where stopping is expensive.

Priming only the patches. Patch compound is more absorbent than the board around it, so spot priming produces a topcoat with visible dull rectangles. Prime the whole wall.

Skipping it to save a day. Two coats of paint over bare drywall costs more than one coat of primer plus one coat of paint, and it still looks worse.

FAQ

Primer questions

Does primer cover more or less than paint?

Less on a new surface. Bare drywall takes primer at 250–300 sq ft per gallon against 350 for paint, because the paper and joint compound absorb it. On a sealed, previously painted wall the two rates are close.

Do I need to prime before painting?

On bare drywall, patched areas, bare wood, or any colour change from dark to light — yes. On a sound, clean, previously painted wall in a similar colour, a paint-and-primer product is acceptable.

Is one coat of primer enough?

Usually, on a uniform surface. Two coats where you are blocking a stain, covering a dark colour, or sealing new joint compound that varies in porosity — one coat over patchy absorption shows as a blotchy topcoat.

Can I tint primer?

Yes, most suppliers tint primer to 50% of the topcoat colour. That reduces the number of topcoats needed and is standard practice for dark colours going to light.

REL

Related calculators